Advertisement

Clear-up from the Boxing Day floods continues

Flooding on Boxing Day devastated large parts of Yorkshire.

View all 212 updates ›

New bridge to be installed at Elland

A second new river crossing will be opened today to help replace flood-damaged Elland bridge.

A new footbridge also opened at Elland last month Credit: ITV News

The new footbridge bridge will be in addition to the pedestrian crossing point, installed last month, and will carry utilities such as water, gas, electricity cables and telecoms.

The road bridge over the canal will be demolished and rebuilt after being damaged beyond repair in the Boxing Day floods.

The government has promised to fund the £5m cost of the new road bridge.

More on this story