'Significant milestone' reached in Sellafield nuclear waste clean up job
A 50-tonne piece of equipment has arrived on site which will be used to retrieve highly radioactive waste.
A 50-tonne piece of equipment has arrived on site which will be used to retrieve highly radioactive waste.
Part of a machine which will play a crucial role cleaning up the most hazardous building at Sellafield has arrived on site.
The 50-tonne component was transferred three miles by road from Beckermet.
It will retrieve radioactive waste from the Magnox Swarf Storage facility.
Emma brings you Sunday night's forecast
Scotland has reported no new deaths of people who had contracted coronavirus for the third day running
Saturday's Pollen forecast with Emma